Gym Progress Information

WE ARE OPEN!  COME ON IN AND BEGIN YOUR FITNESS JOURNEY
(And have some fun!)

Latest Building Update:         6-21-17

We are still on track to open the first week of July, no later than the second week of July.

– The painter will be done with the inside of the building today. He will begin the outside tomorrow, weather permitting.
– About 1/2 of the equipment is arriving tomorrow. This includes the York benches, Power Racks, Olympic Bars, Weights and Dumbbells.
– The Body Masters Circuit machines will be arriving next week. So will the lockers.
– The contractor will have the new floor down in the hallway and bathroom by mid next week.
– The hallway and bathroom have been repainted.  We will be putting up a paper towel dispenser and a mirror over the sink.
– The new drinking fountain will be installed late next week.
– We are waiting on Mediacom to get us a phone # to finish our signs. I can’ t make any promises on when that will occur. (Frustrated!)
– The new security cameras have been installed.
– The Treadmills and Elliptical machines will be arriving next week.

More details will follow, as will pics once the new equipment is assembled and placed in the gym.